The tentative schedule for the Portland Design Commission meeting of December 6, 2012 contains the following item pertaining to Grant Park Village (Albina Fuel site).
2. LU 12-186554 DZM AD – Grant Park Village Chris Caruso, BDS, 503-823-5747
APPLICANT: Greg Mitchell, LRS Architects ADDRESS: NE Broadway at NE 32nd/NE 33rd Ave
APPLICANT: Greg Mitchell, LRS Architects ADDRESS: NE Broadway at NE 32nd/NE 33rd Ave
Modifications requested include:
1. Projecting Sign Size – To allow signs projecting into the right-of-way to be larger than 30 SF each. Two projecting signs at 100 SF each are proposed.
2. Ground Floor Windows – To reduce the amount of ground floor windows to below the required standards for non-residential development walls facing public and private rights-of-way around the site.
3. Building Height – To increase portions of the building height in the CS zone from 45 feet to as tall as 60'-8" above grade.
4. Loading – To allow trucks to enter the loading area off of NE Weidler with rearward motion rather than forward motion.
Design Commission hearings are held at 1900 SW 4th Ave, Room 2500A. Live audio of the hearing is available at the time by going to a link contained in the PDF of the Commission agenda (PDF):
(sorry unable to provide direct web links)
Transcripts, documents and audio of previous Design Commission hearings on Grant Park Village are available here:

No comments:
Post a Comment